{{!navigationIsOpen ? 'Menu' : 'Close'}}
Get in touch

2 Fitzroy Place, London

A renewed sense of place now defines the building’s arrival experience.

The newly refurbished MoreySmith-designed reception delivers a striking first impression through its sophisticated finishes and refined detailing. A vertical garden by landscape architect Daniel Bell provides a natural focal point, complemented by a welcoming coffee bar and a variety of seating areas, including flexible touchdown spaces designed to support modern ways of working.

The scheme also focuses on enhancing occupier wellbeing and sustainability, with best-in-class end-of-journey facilities that include luxury showers and changing rooms, digital lockers, a towel service, a drying room, and an upgraded cycle store. Together, these amenities promote active travel and contribute to a healthier workplace environment.

Location London
Project Value Confidential
Client Ashby Capital / Aviva Investors
Services
  • Engineering

L&P Group provided comprehensive MEP services for the refurbishment of the reception, end-of-trip facilities, and third-floor Cat A fit-out on behalf of Ashby Capital and Aviva Investors.

“Our involvement at 2 Fitzroy Place reflects our continued commitment to delivering high-quality, energy-efficient building services within London’s most demanding commercial environments,” said Sasi Natarajan, Associate Director at L&P Group. “The success of this project is the result of close collaboration, technical precision, and a shared focus on creating exceptional spaces for people to work and thrive.”

Paul Stubbs, Senior Mechanical Engineer, added: “It’s been rewarding to see how the design has come together — from concept through to delivery — to create a modern, comfortable, and sustainable environment that meets the needs of both occupiers and operators.”

01

Connected

Keeping in close contact with our client and team throughout the process enabled a coordinated approach to the solution to complex issues.
02

Informed

We listened - and understood from the outset the requirements for delivery and how to achieve them as a team.
03

Integrity

Balancing the delivery of the project alongside the design team to deliver an efficient service.